Structural Engineering Projects

Structural engineering design projects

We have been mainly involved in Oil Industry Projects, and have designed Lattice structures, Cantilevers, Towers and Cranes for rough deepsea conditions. Therefore we are perfectly capable of providing structural engineering design for other ordinary onshore structures with special conditions, including loadings as – earthquake, which is very similar to offshore rig motion loading.

Aker Solutions

as a subcontractor of Aker MH (=Maritime Hydraulics) (Kristiansand)

We have finished over 150 projects for our client on a large number of rigs.

Rig names – we were involved:
Petrorig-1,2,3; Seadrill-8,9,10; Transocean; AkerH6a,H6b; Sevan; MPF; West E Drill; West Eminence; West Navigator; West Aquarius; West Future II; Ben Loyal; Ocean Vanguard; Songa Venus; Songa Dee; Songa Neptune; Songa Explorer; Frigstad; Snorre A; Snorre B; Thunderhorse; Petroserv; CNOOC; TMT-1,2; Oseberg East; Grupo R; Pride North America; Pride Brazil; Pride Carlos Walter; Bideford Dolphin; Odebrectht 1; Carolina;

Project types – we have made several of:
Riser Fingerboard ; DP_DC Fingerboard; Adjustable Casing Fingerboard; Bellyboard ; Gantry Crane; Rathole; Riser Spider Skid; Tail in Arm; Casing Feeding Machine; Riser Chute; Riser Gantry Crane; Standbuilder Arm; Lower Guiding Arm; Underhull Guide; Casing Building Arm; Tubular Chute; Tail in Machine; X-mas tree guide; BOP Trolley; Upper Racking Arm; Intermediate Racking Arm; Through Moonpool Guide; Monkey Hand; Bridge Crane; Riser Tensioner; BOP Seafastening device; Drill String Compensator; DAT Trip Saver; PDPH; DDM Test Tower; Riser Inspection Pedestal; Overhull Extension Guide; Production Tree Tansporter; BOP Stack up Guide; VPH Test Tower;

A few of the main projects:

AkerH6a

Rops adapter + cradle calculations

Odebrecht 1

Casing Fingerboard

Petrorig-1

STANDARD - Access Basket

Carolina

TFM - AFT CRADLE

Ocean Vanguard

Intermediate Racking Arm

Oseberg East

Fingerboard DP/DC

Ben Loyal

DDM Dolly

CNOOC

Riser Inspection Pedestal

Seadrill 10

Casing Building Arm

Seadrill 8

Casing Feeding Machine

Seadrill 10

Casing Feeding Machine

Seadrill 8

Adjustable Casing Fingerboard

AkerH6a

Adjustable Casing Fingerboard

Seadrill 10

Adjustable Casing Fingerboard

Sevan

Adjustable Casing Fingerboard

MPF

Adjustable Casing Fingerboard

West E Drill

Fingerboard DP/DC

AkerH6a

Fingerboard DP/DC

Songa Venus

Fingerboard DP/DC

Frigstad

Fingerboard DP/DC

Seadrill 8

Fingerboard DP/DC

Seadrill 8

Bellyboard

Seadrill 10

Fingerboard DP/DC

Seadrill 10

Bellyboard

Sevan

Fingerboard DP/DC

Sevan

Bellyboard

MPF

Fingerboard DP/DC

MPF

Bellyboard

Songa Dee

Fingerboard DP/DC

Seadrill 8

Riser Fingerboard

AkerH6a

Riser Fingerboard

West E Drill

Gantry Crane

West Eminence

Gantry Crane

Seadrill 10

Gantry Crane

Sevan

Gantry Crane

West E Drill

Guide Line Winch

Snorre A

Intermediate Racking Arm

Seadrill 8

Lower Guiding Arm

Sevan

Lower Guiding Arm

MPF

Lower Guiding Arm

West Navigator

Overhull Extension Guide

Seadrill 8

BOP-Trolley & Rails

Seadrill 8

Casing Building Deck

AkerH6a

Riser Handling Crane

Seadrill 8

Riser Inspection Stool

Seadrill 10

Riser Feeding Machine

Sevan

Riser Feeding Machine

West E Drill

BOP Skid 400mT

AkerH6a

Rathole

Seadrill 8

Riser Chute

West E Drill

Riser Spider Skid

Seadrill 10

Standbuilding Arm

Sevan

Standbuilding Arm

MPF

Standbuilding Arm

West E Drill

Tail In Arm

AkerH6a

Tail In Arm

Frigstad

Tail In Arm

Thunder Horse

Production Tree Transporter

West Navigator

PDPH Loading scheme

West E Drill

Rathole

AkerH6a

Riser Chute

AkerH6a

Riser Spider Skid

Seadrill 8

TFM Feeding Frame

Seadrill 10

TFM Feeding Frame

West E Drill

BOP Stack up Guide

West E Drill

X-mas Stack up Guide

Test Tower

Testing Tower VPH

West E Drill

Tubular Shuttle and Aux Rig

Sevan

Underhull Guide

Petroserv

Underhull Guide

Frigstad

Tubular Chute

 

Cases


Tubular Feeding Machine and Support Structures

The Riser Tubular Feeding Machine (TFM) is handling Risers and Slipjoint from a horizontal position and into vertical position in the center well. The pipes are supported by the trolley and front cradle, when horizontal. The pipes are lifted by the DDM and supported by the trolley only when inclined. The trolley is supported by the Skate. The Skate is moving on a rail which is supported by the support structures. The structural engineering design of each main part have been prepared in one consistent document.

Codes



  • TIA/EIA

  • EuroCode3:
    Design of Steel structures

  • FEM:
    Rules for Heavy Lifting Appliances (loading, stress, fatigue calculation)